Alternative Fuels

GTT receives two new tank design orders for CMES’ LNG carriers

January 30, 2023

French LNG containment specialist GTT will design the tanks of two 175,000-cbm liquefied natural gas (LNG) carriers set to be delivered by the third quarter of 2026.


PHOTO: Illustrative model of GTT Mark III Flex membrane containment system. GTT


Chinese shipyard Dalian Shipbuilding (DSIC) has ordered tanks for the LNG carriers it is building for Shanghai-listed China Merchants Energy Shipping (CMES).

The tanks will be fitted with GTT’s Mark III Flex membrane containment system, which it explains as "a cryogenic liner used to contain liquefied gas at low temperatures during shipping, onshore and offshore storage, at atmospheric pressure,”

By Konica Bhatt

Please get in touch with comments or additional info to news@engine.online